2014-10-03

# 369

N/A

During the last day KhNPP generated 38,87 million kWh

2014-10-31

# 336

On October 31, 2014, the 1st unit's power is 605 MW. Daily generation of electricity is 14,57 million kWh and 438,1 since the beginning of month.
The 2nd unit's power is 1010 MW. Daily generation of electricity is 24,3 million kWh and 260,36 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Important...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

During the last day KhNPP generated 38,9 million kWh

2014-10-30

# 335

On October 30, 2014, the 1st unit's power is 605 MW. Daily generation of electricity is 14,6 million kWh and 423,5 since the beginning of month.
The 2nd unit's power is 1010 MW. Daily generation of electricity is 24,3 million kWh and 236,3 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Important...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

During the last day KhNPP generated 38.9 million kWh

2014-10-29

# 334

On October 29, 2014, the 1st unit's power is 605 MW. Daily generation of electricity is 14.6 million kWh and 408.9 since the beginning of month.
The 2nd unit's power is 1010 MW. Daily generation of electricity is 24.3 million kWh and 211.74 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Important...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

2014-10-28

# 333

N/A

N/A

During the last day KhNPP generated 38.75 million kWh

2014-10-28

# 332

On October 28, 2014, the 1st unit's power is 609 MW. Daily generation of electricity is 14,61 million kWh and 394,3 since the beginning of month.
The 2nd unit's power is 1010 MW. Daily generation of electricity is 24,14 million kWh and 187,4 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Emission from 20.10.2014 to 27.10.2014

Emission MPE, %
long-lived nuclides 0,0028
Inert gases 0,096
Iodine 0,0007

Important...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

2014-10-27

# 331

N/A

N/A

During the last day KhNPP generated 40.33 million kWh

2014-10-27

# 330

On October 27, 2014, the 1st unit's power is 606 MW. Daily generation of electricity is 15.16 million kWh and 379.68 since the beginning of month.
The 2nd unit's power is 1000 MW. Daily generation of electricity is 25.17 million kWh and 163.31 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Important...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

2014-10-24

# 329

N/A

During the last day KhNPP generated 37.88 million kWh

2014-10-24

# 328

On October 24, 2014, the 1st unit's power is 600 MW. Daily generation of electricity is 14,61 million kWh and 335,38 since the beginning of month.
The 2nd unit's power is 1000 MW. Daily generation of electricity is 23,27 million kWh and 89,89 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Important...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

During the last day KhNPP generated 36.96 million kWh

2014-10-23

# 327

On October 23, 2014, the 1st unit's power is 607 MW. Daily generation of electricity is 14.57 million kWh and 320.77 since the beginning of month.
The 2nd unit's power is 930 MW. Daily generation of electricity is 22.39 million kWh and 66.62 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Important...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

2014-10-22

# 326

This information is available in the Ukrainian version.

During the last day KhNPP generated 36.97 million kWh

2014-10-22

# 325

On October 22, 2014, the 1st unit's power is 607 MW. Daily generation of electricity is 14.56 million kWh and 306.22 since the beginning of month.
The 2nd unit's power is 930 MW. Daily generation of electricity is 22.41 million kWh and 44.23 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Important...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

During the last day KhNPP generated 31.13 million kWh

2014-10-21

# 324

On October 21, 2014, the 1st unit's power is 607 MW. Daily generation of electricity is 14.56 million kWh and 291.65 since the beginning of month.
The 2nd unit's power is 930 MW. Daily generation of electricity is 16.57 million kWh and 21.82 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Important...

Results of Emission Monitoring more...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

Results of Emission Monitoring

2014-10-20

# 323

Emission from 13.10.2014 to 20.10.2014

Emission MPE, %
long-lived nuclides 0.0028
Inert gases 0.104
Iodine 0.0007

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Khmelnitsky-2 connected to the grid

2014-10-20

# 322

After the outage, Khmelnitsky-2 was connected to the power grid at 9:47 a.m. on October 19.

On October 20, 2014, Khmelnitsky-2 is at 600 MW power. Daily generation of electricity is 5.24 mln. KWh.

Khmelnitsky 1 power is 600 MW. Daily generation of electricity is 14.61 mln. kWh and 277.09 mln kWh since the beginning of month.

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Important...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

2014-10-17

# 321

This information is available in the Ukrainian version.

During the last day KhNPP generated 14.52 million kWh

2014-10-17

# 320

On October 17, 2014, Khmelnitsky 1 power is 605 MW. Daily generation of electricity is 14.52 mln. kWh and 233.31 mln kWh since the beginning of month.

Khmelnitsky 2 has been in outage for 67 days.

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.


Important...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

2014-10-16

# 319

This information is available in the Ukrainian version.

During the last day KhNPP generated 14.55 million kWh

2014-10-16

# 318

On October 16, 2014, Khmelnitsky 1 power is 605 MW. Daily generation of electricity is 14.55 mln. kWh and 218.78 mln kWh since the beginning of month.

Khmelnitsky 2 has been in outage for 66 days.

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.


Important...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

During the last day KhNPP generated 14.6 million kWh

2014-10-15

# 317

On October 15, 2014, Khmelnitsky 1 power is 605 MW. Daily generation of electricity is 14.6 mln. kWh and 204.2 mln kWh since the beginning of month.

Khmelnitsky 2 has been in outage for 65 days.

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.


Important...

Environmental Condition in September more...

Results of Emission Monitoring more...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

2014-10-14

# 316

This information is available in the Ukrainian version.

Results of Emission Monitoring

2014-10-14

# 315

Emission from 06.10.2014 to 10.10.2014

Emission MPE, %
long-lived nuclides 0.0029
Inert gases 0.1195
Iodine 0.0007

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

During the last day KhNPP generated 14.6 million kWh

2014-10-14

# 314

On October 14, 2014, Khmelnitsky 1 power is 605 MW. Daily generation of electricity is 14.6 mln. kWh and 189.7 mln kWh since the beginning of month.

Khmelnitsky 2 has been in outage for 64 days.

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.


Important...

Environmental Condition in September more...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

2014-10-13

# 313

This information is available in the Ukrainian version.

During the last day KhNPP generated 14.5 million kWh

2014-10-13

# 312

On October 13, 2014, Khmelnitsky 1 power is 608 MW. Daily generation of electricity is 14.5 mln. kWh and 175 mln kWh since the beginning of month.

Khmelnitsky 2 has been in outage for 63 days.

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.


Important...

Environmental Condition in September more...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

2014-10-10

# 311

This information is available in the Ukrainian version.

2014-10-10

# 310

This information is available in the Ukrainian version.

During the last day KhNPP generated 14.53 million kWh

2014-10-10

# 309

On October 10, 2014, Khmelnitsky 1 power is 605 MW. Daily generation of electricity is 14.53 mln. kWh and 131.4 mln kWh since the beginning of month.

Khmelnitsky 2 has been in outage for 60 days.

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.


Important...

Environmental Condition in September more...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

2014-10-09

# 308

This information is available in the Ukrainian version.

2014-10-09

# 307

This information is available in the Ukrainian version.

During the last day KhNPP generated 14.64 million kWh

2014-10-09

# 306

On October 9, 2014, Khmelnitsky 1 power is 609 MW. Daily generation of electricity is 14.61 mln. kWh and 116.87 mln kWh since the beginning of month.

Khmelnitsky 2 has been in outage for 59 days.

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.


Important...

Environmental Condition in September more...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

2014-10-08

# 305

This information is available in the Ukrainian version.

During the last day KhNPP generated 14.62 million kWh

2014-10-08

# 304

On October 8, 2014, Khmelnitsky 1 power is 609.06 MW. Daily generation of electricity is 14.62 mln. kWh and 102.25 mln kWh since the beginning of month.

Khmelnitsky 2 has been in outage for 58 days.

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.


Important...

Environmental Condition in September more...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

2014-10-07

# 303

This information is available in the Ukrainian version.

During the last day KhNPP generated 14.59 million kWh

2014-10-07

# 302

On October 7, 2014, Khmelnitsky 1 power is 607.86 MW. Daily generation of electricity is 14.59 mln. kWh and 87.64 mln kWh since the beginning of month.

Khmelnitsky 2 has been in outage for 57 days.

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.


Important...

Results of emmission monitoring more...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

2014-10-06

# 301

This information is available in the Ukrainian version.

Results of emmission monitoring

2014-10-06

# 300

Emission from 29.09.2014 to 03.10.2014

Emission MPE, %
long-lived nuclides 0.0029
Inert gases 0.1329
Iodine 0.0007

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

During the last day KhNPP generated 14.63 million kWh

2014-10-06

# 299

On October 6, 2014, Khmelnitsky 1 power is 609 MW. Daily generation of electricity is 14.63 mln. kWh and 75 mln kWh since the beginning of month.

Khmelnitsky 2 has been in outage for 56 days.

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.


Important...

Production Activity in September more...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

2014-10-03

# 298

This information is available in the Ukrainian version.

During the last day KhNPP generated 14.62 million kWh

2014-10-03

# 297

On October 3, 2014, Khmelnitsky 1 power is 600 MW. Daily generation of electricity is 14.62 mln. kWh and 29,2 mln kWh since the beginning of month.

Khmelnitsky 2 has been in outage for 53 days.

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.


Important...

Production Activity in September more...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

2014-10-02

# 296

This information is available in the Ukrainian version.

2014-10-02

# 295

This information is available in the Ukrainian version.

During the last day KhNPP generated 14.6 million kWh

2014-10-02

# 294

On October 2, 2014, Khmelnitsky 1 power is 607 MW. Daily generation of electricity is 14.6 mln. kWh.

Khmelnitsky 2 has been in outage for 52 days.

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.


Important...

Production Activity in September more...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP

2014-10-01

# 293

This information is available in the Ukrainian version.

2014-10-01

# 292

This information is available in the Ukrainian version.
Energoatom Compliance Policy Download document (~0.27 МБ)

During the last day KhNPP generated 14.56 million kWh

2014-10-01

# 291

On October 1, 2014, Khmelnitsky 1 power is 607 MW. Daily generation of electricity is 14.56 mln. kWh.
438.7 mln kWh was generated in September.

Khmelnitsky 2 has been in outage for 51 days.

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.


Important...

Production Activity more...

Radiation monitoring  more...

Meteorological parameters more...

Information Centre of SE KhNPP