During the last day KhNPP generated 24.07 million kWh

2015-10-21

# 393

On October 21, Khmelnitsky 1 is at 1002 MW power. 24.07 mln. kWh was generated on October 20, and 301.76 mln. kWh has been generated since the beginning of the month.

Khmelnitsky 2 has been in outage for 14 days.
On October 8, 2015, Khmelnitsky 2 was disconnected from the power grid for outage at 00:09 a.m.

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.


Important...

Radiation Monitoring

Results of Emission Monitoring for Oct. 12 - Oct. 19

Information Centre of SE KhNPP