24.23 million kWh was generated on October 10

2016-10-11

# 358

On October 9, 2016 at 4:58 Khmelnitsky 2 was disconnected from the grid for scheduled maintenance. Planned duration of the outage is 52 days.
On October 11, 2016, Khmelnitsky 1 is at 1010 MW power. Daily generation of electricity is 24.23 million kWh. 242.63 mln. kWh has been generated since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.
Information Centre of SE KhNPP