On October 25, 2017, Khmelnitsky-1 operates at a capacity of 677 MW. Over the past day, the power unit generated 16.23 mln kWh of electricity. 391.71 mln kWh has been generated by Khmelnitsky-1 since the beginning of the month.

Khmelnitsky-2 has been connected to the grid at 09:56 am after start-up operations. Power rise proceeds.

Radiation situation on the site and adjacent areas has not changed, and remains at the level corresponding to normal operation of power units, and does not exceed natural background values.