Results of Emission Monitoring

2018-05-14

# 162

Emission from 07.05.2018 to 14.05.2018

Emission MPE, %
long-lived nuclides 0.0027
Inert gases 0.0632
Iodine 0.00067

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values
Information Centre of SE KhNPP

Daily Information on Khmelnitsky NPP Operation

2018-05-14

# 161

Today, on May 14, Khmelnitsky 1 has been in maintenance for 40 days.
On the 3rd of April at 3:02 p.m. Khmelnitsky 1 was disconnected from the grid due to the actuation of generator protection system.

Khmelnitsky 2 operates at power of 1007 MW. Over the previous day the power unit generated 24.16 mln. kW*hour of electricity, and electricity generated from the beginning of the month amounts to 313.57 mln. kW*hour.

Radiation environment at the site and on the adjacent regions has not been changed, and remains on the level pertinent to normal operation of power units, and does not exceed natural background values.
Information Centre of SE KhNPP