On January 9, 2018, Khmelnitsky-1 has been in outage for 64 days. On November 7, 2017, Khmelnitsky-1 was disconnected from the grid for middle maintenance.

Khmelnitsky-2 operates at 1011 MW power. Over the past day, the power unit generated 5.76 million kWh of electricity. 55.22 million kWh of electricity has been generated since the beginning of the month.
Khmelnitsky-2 was connected to the grid at 03:19 p.m. after the maintenance.

Radiation situation on the site and adjacent areas has not changed, and remains at the level corresponding to normal operation of power units, and does not exceed natural background values.
Information Centre of SE KhNPP
Khmelnitsky-2 Connected to the Grid

2018-01-08

8

#

On January 8, 2018, Khmelnitsky-2 was connected to the grid at 03:19 p.m. after the maintenance.

Radiation situation on the site and adjacent areas has not changed, and remains at the level corresponding to normal operation of power units, and does not exceed natural background values.

On January 3, 2018, at 1:57 a.m., in response to a submitted request, KhNPP-2 was disconnected from the grid to eliminate a coolant leak on the sealing of the control rod drive “housing-rod drive” assembly of the Reactor Control and Protection System (RCPS). Relevant maintenance activities are in progress.
Information Centre of SE KhNPP
Daily Information on Khmelnitsky NPP Operation

2018-01-05

7

#

On January 5, Khmelnitsky-1 has been in outage for 60 days. On November 7, 2017, Khmelnitsky-1 was disconnected from the grid for middle maintenance.

Khmelnitsky-2 has been in outage for 3 days.
On January 3, 2018, at 1:57 a.m., in response to a submitted request, KhNPP-2 was disconnected from the grid to eliminate a coolant leak on the sealing of the control rod drive “housing-rod drive” assembly of the Reactor Control and Protection System (RCPS). Relevant maintenance activities are in progress.

Radiation situation on the site and adjacent areas has not changed, and remains at the level corresponding to normal operation of power units, and does not exceed natural background values.
Information Centre of SE KhNPP
Daily Information on Khmelnitsky NPP Operation

2018-01-04

6

#

On January 4, Khmelnitsky-1 has been in outage for 59 days. On November 7, 2017, Khmelnitsky-1 was disconnected from the grid for middle maintenance.

On January 3, 2018, at 1:57 a.m., in response to a submitted request, KhNPP-2 was disconnected from the grid to eliminate a coolant leak on the sealing of the control rod drive “housing-rod drive” assembly of the Reactor Control and Protection System (RCPS). Relevant maintenance activities are in progress.

Radiation situation on the site and adjacent areas has not changed, and remains at the level corresponding to normal operation of power units, and does not exceed natural background values.
Information Centre of SE KhNPP
До уваги жителів м. Нетішин

2018-01-03

5

#

У зв’язку з плановим ремонтом енергоблока №1 та ремонтом енергоблока №2 Хмельницької АЕС у наслідок відключення, з 03.01.2018 до 09.01.2018  в м. Нетішин буде обмежене теплопостачання (опалення та гаряче водопостачання).

Підігрів мережевої води системи теплопостачання буде здійснюватися паровими котлами ПРК ХАЕС.

В зв’язку з обмеженими можливостями виробництва теплової енергії просимо споживачів економно використовувати теплову енергію системи опалення та гарячу воду (двері та вікна тримати зачиненими, та утепленими, обмежити використання гарячої води).

Просимо вибачення за незручності!
Адміністрація Комунального господарства ВП ХАЕС
Khmelnitsky 2 disconnected from the grid

2018-01-03

4

#

3 січня цього року о 01 год. 57 хв., згідно із поданою заявкою, енергоблок №2 відключено від енергомережі для усунення пропускання середовища на ущільнюючій поверхні вузла «чохол – блок переміщення» на приводі органів регулювання системи управління захисту (ОР СУЗ).

Енергоблок №2 знаходиться у стані «гаряче зупинення». Причини порушення встановлюються.
Згідно із міжнародною шкалою INES дану подію класифікують рівнем «0» (поза шкалою).

За минулу добу енергоблоком вироблено 24,27 млн. кВт*год електроенергії, а з початку місяця -48,59 млн. кВт*год електроенергії.

Сьогодні, 3 січня 2018 року на енергоблоці №1 Хмельницької АЕС триває п’ятдесят восьма доба планово-попереджувального ремонту.

Радіаційний стан на промисловому майданчику та у прилеглих регіонах не зазнавав змін, знаходиться на рівні, відповідному нормальній експлуатації енергоблоків, і не перевищує природних фонових значень.
Information Centre of SE KhNPP
Results of Emission Monitoring

2018-01-02

3

#

Emission from 26.12.2017 to 02.01.2018

Emission MPE, %
long-lived nuclides 0.0067
Inert gases 0.074
Iodine 0.0007

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values
Information Centre of SE KhNPP
Скелелазів із міста-супутника Хмельницької АЕС зараховано до резерву збірної України

2018-01-19

22

#

Спортсмени клубу «Вершина» завоювали дві нагороди на відкритому чемпіонаті Хмельницької області зі скелелазіння серед юнаків та дівчат у дисципліні боулдеринг, який проходив нещодавно в Кам’янець-Подільському. У змаганні взяли участь понад 170 учасників зі всієї України в семи вікових категоріях.

Нетішинські скелелази клубу «Вершина», яким опікується працівник Хмельницької АЕС Олександр Веремійчук, у віковій категорії 2003-2004 років народження увійшли до трійки найкращих. Зокрема, срібну нагороду виборола Катерина Педько, поступившись лише чемпіонці Європи Ніці Потаповій. За підсумками змагань вона також виконала перший дорослий розряд.

За крок до медалей зупинилася ще одна вихованка клубу Вікторія Нікітіна, яка була четвертою. Третє місце серед юнаків у цій віковій категорії посів Ярослав Кондратюк.

Стабільні результати та майстерність, яку продемонстрували скелелази з міста атомників наблизили юних спортсменів до заповітної мети. Катерину Педько та Ярослава Кондратюка зарахували до резерву збірної України та запросили на навчально-тренувальні збори найсильніших скелелазів України.

Тренер Олександр Веремійчук задоволений результатами підопічних і впевнений, що юні скелелази готові до нових випробувань.

Information Centre of SE KhNPP
Daily Information on Khmelnitsky NPP Operation

2018-01-19

21

#

On January 19, 2018, Khmelnitsky-1 has been in outage for 74 days. On November 7, 2017, Khmelnitsky-1 was disconnected from the grid for middle maintenance.

Khmelnitsky-2 operates at 1009 MW power. Over the past day, the power unit generated 24.28 million kWh of electricity. 297.77 million kWh of electricity has been generated since the beginning of the month.

Radiation situation on the site and adjacent areas has not changed, and remains at the level corresponding to normal operation of power units, and does not exceed natural background values.
Information Centre of SE KhNPP
Daily Information on Khmelnitsky NPP Operation

2018-01-18

20

#

On January 18, 2018, Khmelnitsky-1 has been in outage for 73 days. On November 7, 2017, Khmelnitsky-1 was disconnected from the grid for middle maintenance.

Khmelnitsky-2 operates at 1009 MW power. Over the past day, the power unit generated 24.18 million kWh of electricity. 273.49 million kWh of electricity has been generated since the beginning of the month.

Radiation situation on the site and adjacent areas has not changed, and remains at the level corresponding to normal operation of power units, and does not exceed natural background values.
Information Centre of SE KhNPP
Хмельницька АЕС виконала план з виробництва електроенергії за грудень на 102,2%

2018-01-02

2

#

Хмельницька атомна електростанція виконала планове завдання з виробництва електроенергії за грудень 2017 року на 102,2%. З початку 2017 року даний показник склав 105,3%.

У грудні 2017 року другим енергоблоком Хмельницької атомної електростанції вироблено 753,6 млн. кВт*год електроенергії при плані 737 млн. кВт*год електроенергії. На енергоблоці №2 триває планово-попереджувальний ремонт, який було розпочато 7 листопада 2017 року.

З коефіцієнтом використання встановленої потужності (КВВП) 50,64% Хмельницька атомна електростанція відпрацювала грудень поточного року.

За 2017 рік ХАЕС виробила 13 382,4 млн. кВт*год електроенергії. Виробіток електроенергії першим енергоблоком Хмельницької АЕС склав 6 145,7 млн. кВт*год, другим – 7236,7 млн. кВт*год.

З початку експлуатації (станом на 24:00 31.12.2017 р.) двома енергоблоками ХАЕС вироблено 281 371,7 млн. кВт * год електроенергії.

Радіаційний стан на промисловому майданчику та у прилеглих регіонах не зазнавав змін, знаходиться на рівні, відповідному нормальній експлуатації енергоблоків, і не перевищує природних фонових значень.
Information Centre of SE KhNPP
Daily Information on Khmelnitsky NPP Operation

2018-01-17

19

#

On January 17, 2018, Khmelnitsky-1 has been in outage for 72 days. On November 7, 2017, Khmelnitsky-1 was disconnected from the grid for middle maintenance.

Khmelnitsky-2 operates at 1003 MW power. Over the past day, the power unit generated 24.2 million kWh of electricity. 249.31 million kWh of electricity has been generated since the beginning of the month.

Radiation situation on the site and adjacent areas has not changed, and remains at the level corresponding to normal operation of power units, and does not exceed natural background values.
Information Centre of SE KhNPP
Схід-Захід разом: діти з Луганщини відвідали Хмельницьку АЕС

2018-01-16

18

#

16 січня цього року в рамках проекту «Схід-Захід разом. Діти» старшокласники із Старобільська Луганської області відвідали Хмельницьку АЕС. Знайомство із основами ядерної галузі та принципом роботи атомної електростанції луганчани розпочали з інформаційного центру ХАЕС. Побували діти і в навчально-тренувальному центрі, в пожежній частині та в машинному відділенні атомної станції.

Багато вражень та позитивних емоцій принесла, як дітям так і дорослим, подорож до міста енергетиків. За словами вчителя з луганщини Віктора Гришанова, екскурсія на Хмельницьку АЕС була дуже очікуваною і надзвичайно цікавою та пізнавальною. Викладач отримав відповіді на всі питання, які його цікавили і пересвідчився, що «на гіганті енергетики нашої країни працюють фахові та високопрофесійні кадри».

Це вже не перша екскурсія дітей зі сходу і на Хмельницьку АЕС, так в липні минулого року на енергетичному об’єкті побували школярі зі Станиці Луганської, Петропавлівки, Сотенного, Верхньобогданівки.

Старшокласники з Луганщини вже відвідали Різдвяний фестиваль «Нетішинська коляда», де спробували себе в ролі учасників. Протягом чотирьох днів перебування в місті атомників молодь зі сходу ознайомлять із історичним та культурним надбанням краю: Острозькою академією, Нетішинським  та Острозьким музеями.
Information Centre of SE KhNPP
Daily Information on Khmelnitsky NPP Operation

2018-01-16

17

#

Медальним виступом підсумували спортивний сезон юні фехтувальники з міста енергетиків. Зокрема, на чемпіонаті України з фехтування на шаблях серед кадетів, який проходив 14-15 січня цього року в Києві, вихованка Нетішинської комплексної дитячо-юнацької спортивної школи (КДЮСШ) Марина Форсюк завоювала бронзову нагороду.

Фехтувальники спортивної школи, якою опікується профспілковий комітет ВП ХАЕС, у боротьбі за найвищі нагороди довели, що за правом входять до когорти найкращих. Свідчення тому – визнання вихованців Нетішинської КДЮСШ на різних рівнях.

Так, за підсумками 2017 року серед найкращих спортсменів Хмельниччини Ольга Жовнір і Дмитро Пундик, заслужені майстри спорту України з фехтування, - «Кращі спортсмени з олімпійських видів спорту». У категорії «Кращий тренер з олімпійських видів спорту» це звання  отримав тренер національної жіночої команди з фехтування на шаблях Олег Штурбабін,  тренер-викладач вищої категорії з фехтування.

Завершення спортивного сезону вдале, чекаємо від спортсменів з міста-супутника Хмельницької АЕС нових перемог.

Information Centre of SE KhNPP
Daily Information on Khmelnitsky NPP Operation

2018-01-16

16

#

On January 16, 2018, Khmelnitsky-1 has been in outage for 71 days. On November 7, 2017, Khmelnitsky-1 was disconnected from the grid for middle maintenance.

Khmelnitsky-2 operates at 1005 MW power. Over the past day, the power unit generated 24.2 million kWh of electricity. 225.11 million kWh of electricity has been generated since the beginning of the month.

Radiation situation on the site and adjacent areas has not changed, and remains at the level corresponding to normal operation of power units, and does not exceed natural background values.
Information Centre of SE KhNPP
Results of Emission Monitoring

2018-01-15

15

#

Emission from 09.01.2018 to 15.01.2018

Emission MPE, %
long-lived nuclides 0.0076
Inert gases 0.0718
Iodine 0.0008

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values
Information Centre of SE KhNPP
Daily Information on Khmelnitsky NPP Operation

2018-01-15

14

#

On January 15, 2018, Khmelnitsky-1 has been in outage for 70 days. On November 7, 2017, Khmelnitsky-1 was disconnected from the grid for middle maintenance.

Khmelnitsky-2 operates at 1008 MW power. Over the past day, the power unit generated 24.29 million kWh of electricity. 200.9 million kWh of electricity has been generated since the beginning of the month.

Radiation situation on the site and adjacent areas has not changed, and remains at the level corresponding to normal operation of power units, and does not exceed natural background values.
Information Centre of SE KhNPP
Daily Information on Khmelnitsky NPP Operation

2018-01-12

13

#

On January 12, 2018, Khmelnitsky-1 has been in outage for 67 days. On November 7, 2017, Khmelnitsky-1 was disconnected from the grid for middle maintenance.

Khmelnitsky-2 operates at 1010 MW power. Over the past day, the power unit generated 24.3 million kWh of electricity. 128 million kWh of electricity has been generated since the beginning of the month.

Radiation situation on the site and adjacent areas has not changed, and remains at the level corresponding to normal operation of power units, and does not exceed natural background values.
Information Centre of SE KhNPP
Daily Information on Khmelnitsky NPP Operation

2018-01-11

12

#

On January 11, 2018, Khmelnitsky-1 has been in outage for 66 days. On November 7, 2017, Khmelnitsky-1 was disconnected from the grid for middle maintenance.

Khmelnitsky-2 operates at 1012 MW power. Over the past day, the power unit generated 24.25 million kWh of electricity. 103.69 million kWh of electricity has been generated since the beginning of the month.
Khmelnitsky-2 was connected to the grid at 03:19 p.m. after the maintenance.

Radiation situation on the site and adjacent areas has not changed, and remains at the level corresponding to normal operation of power units, and does not exceed natural background values.
Information Centre of SE KhNPP
Daily Information on Khmelnitsky NPP Operation

2018-01-10

11

#

On January 10, 2018, Khmelnitsky-1 has been in outage for 65 days. On November 7, 2017, Khmelnitsky-1 was disconnected from the grid for middle maintenance.

Khmelnitsky-2 operates at 1009 MW power. Over the past day, the power unit generated 24.23 million kWh of electricity. 79.45 million kWh of electricity has been generated since the beginning of the month.
Khmelnitsky-2 was connected to the grid at 03:19 p.m. after the maintenance.

Radiation situation on the site and adjacent areas has not changed, and remains at the level corresponding to normal operation of power units, and does not exceed natural background values.
Information Centre of SE KhNPP
Results of Emission Monitoring

2018-01-09

10

#

Emission from 02.01.2018 to 09.01.2018

Emission MPE, %
long-lived nuclides 0.0047
Inert gases 0.0759
Iodine 0.0008

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values
Information Centre of SE KhNPP
Daily Information on Khmelnitsky NPP Operation

2018-01-02

1

#

On January 2, Khmelnitsky-1 has been in outage for 57 days. On November 7, 2017, Khmelnitsky-1 was disconnected from the grid for middle maintenance.

Khmelnitsky-2 operates at 1010 MW power. Over the past day, the power unit generated 24.32 million kWh of electricity.

Radiation situation on the site and adjacent areas has not changed, and remains at the level corresponding to normal operation of power units, and does not exceed natural background values.