Daily Information on Khmelnitsky NPP Operation

2018-03-23

# 99

On March 23, 2018, the 1st unit's power is 1008 MW. Daily generation of electricity is 24.26 million kWh and 533.9 since the beginning of month.
The 2nd unit's power is 1010 MW. Daily generation of electricity is 24.33 million kWh and 535.06 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Daily Information on Khmelnitsky NPP Operation

2018-03-22

# 98

On March 22, 2018, the 1st unit's power is 1008 MW. Daily generation of electricity is 24.26 million kWh and 509.64 since the beginning of month.
The 2nd unit's power is 1010 MW. Daily generation of electricity is 24.32 million kWh and 510.73 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

На Хмельницькій АЕС відбулося навчання з культури безпеки

2018-03-21

# 97

20-21 березня цього року на Хмельницькій АЕС було проведено навчання для працівників Енергоатома, спеціалістів навчально-тренувальних центрів та інших підрозділів атомних станцій України, які братимуть участь у перевірках стану культури безпеки на АЕС у 2018 році.

Провідні фахівці енергокомпанії презентували свої напрацювання щодо методології, способів здійснення перевірки згідно із «Програмою перевірки стану культури безпеки у відокремлених підрозділах ДП «НАЕК «Енергоатом» та ділилися досвідом.

20 березня, в рамках навчання, свої напрацювання щодо способів здійснення перевірки презентували представники Дирекції Компанії. Розповідаючи про методи спостереження і вимоги до нових документів, директор департаменту відомчого нагляду дирекції з нагляду за безпекою ДП «НАЕК «Енергоатом» Олександр Богун зауважив: «Навчатися ми будемо один у одного, тому що кожен із учасників семінару володіє значним досвідом».

Фахівці Хмельницької АЕС, в свою чергу, розповіли про методику спостереження за роботою персоналу, яка здійснюється на підприємстві. За словами заступника головного інженера з підготовки персоналу ВП ХАЕС Володимира Ісупова, ця тематика була рекомендована місією технічної підтримки Всесвітньої асоціації організацій, що експлуатують атомні електростанції (ВАО АЕС). В рамках програми семінару учасники мали нагоду спостерігати за навчанням слюсарів з ремонту арматури ХАЕС.

«Культура безпеки не має інструментів вимірювання чи кількісної оцінки, але ми багато про це говоримо і доводимо інформацію та методики, які постійно вдосконалюються до персоналу ХАЕС. Дискусії, обмін думками на цьому семінарі – черговий крок до розвитку та вдосконалення культури безпеки на АЕС», - зазначив генеральний директор ВП ХАЕС Микола Панащенко під час навчання.

Інформаційний центр ВП ХАЕС

Daily Information on Khmelnitsky NPP Operation

2018-03-21

# 96

On March 21, 2018, the 1st unit's power is 1013 MW. Daily generation of electricity is 24.26 million kWh and 485.37 since the beginning of month.
The 2nd unit's power is 1011 MW. Daily generation of electricity is 24.3 million kWh and 486.41 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Daily Information on Khmelnitsky NPP Operation

2018-03-20

# 95

On March 20, 2018, the 1st unit's power is 1009 MW. Daily generation of electricity is 24.27 million kWh and 461.11 since the beginning of month.
The 2nd unit's power is 1006 MW. Daily generation of electricity is 24.3 million kWh and 462.11 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Фехтувальники міста-супутника Хмельницької АЕС - призери Всеукраїнських змагань

2018-03-19

# 94

Одразу два Всеукраїнські турніри з фехтування на шаблях, у яких взяли участь фехтувальники з міста атомників, проходили цими вихідними у Миколаєві та Львові. Спортсмени комплексної дитячо-юнацької спортивної школи, якою опікується профспілковий комітет Хмельницької АЕС змагалися у Гімназіаді України та турнірі «Дитяча ліга».
Три «бронзові» нагороди завоювали нетішинські шаблісти в Гімназіаді України, де змагалися учасники 2001-2003 років народження. Зокрема, на третю сходинку піднялися Даниїло Логвінов, Марина Форсюк, Дар’я Титаренко.
Не менш вдало виступили і наймолодші спортсмени на турнірі «Дитячої ліги». Фехтувальники здобули дві нагороди найвищого ґатунку, а також «срібло» та «бронзу». Найкращими серед шаблістів міста-супутника Хмельницької АЕС стали Дмитро Загребельний у категорії 2007 – 2008 років народження і Дмитро Колобаєв 2005-2006 р.н., який впевнено посідає першу сходинку у загальному рейтингу, адже це вже друга його перемога у поточному році. Друге місце у турнірі серед наймолодших виборола Адріана Ящук. На третій сходинці серед учасників 2007-2008 років народження Єгор Жебель.
Тренують юних спортсменів Ольга Штурбабіна та Віталій Цисарук, які чекають нових здобутків і перемог у наступних змаганнях. Серед найближчих планів - турнір «Дитячої ліги», який заплановано провести у квітні цього року в місті енергетиків. 

Інформаційний центр ВП ХАЕС

Results of Emission Monitoring

2018-03-19

# 93

Emission from 12.03.2018 to 19.03.2018

Emission MPE, %
long-lived nuclides 0,0036
Inert gases 0,0648
Iodine 0,0006

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values
Information Centre of SE KhNPP

Daily Information on Khmelnitsky NPP Operation

2018-03-19

# 92

On March 19, 2018, the 1st unit's power is 1013 MW. Daily generation of electricity is 24,3 million kWh and 436,8 since the beginning of month.
The 2nd unit's power is 1008 MW. Daily generation of electricity is 24,3 million kWh and 437,8 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Хмельницьку АЕС відвідали представники Громадської ради Хмельницької обласної держадміністрації

2018-03-16

# 91

15 березня цього року Хмельницьку АЕС відвідали учасники Громадської ради Хмельницької обласної держадміністрації. В рамках програми візиту представники громадського контролю за дотриманням прав жителів Хмельниччини на безпечне для життя і здоров’я довкілля, ознайомилися з атомною станцією. Під час перебування на ХАЕС робоча група Громадської ради відвідала навчально-тренувальний центр, машинне відділення та блочний щит управління другого енергоблока, а також зустрілася із керівництвом енергетичного підприємства.

Зокрема, в навчально-тренувальному центрі ВП ХАЕС гостям розповіли про основні технологічні процеси виробництва електроенергії та підготовку персоналу. Представникам Громадської ради була також надана можливість відвідати блочний щит управління та машинне відділення діючого енергоблока.
Під час зустрічі із керівництвом атомної станції учасники делегації отримали вичерпні відповіді на всі питання які цікавили громаду Хмельниччини. Звісно, основне питання, яке хвилює жителів регіону – безпечне функціонування ядерного об’єкта.
Розповідаючи про основні показники діяльності ядерного підприємства, генеральний директор ВП ХАЕС Микола Панащенко зазначив: «Адміністрація і трудовий колектив ХАЕС робить все можливе для постійного підвищення рівня безпеки». Окрім показників радіаційної безпеки, керівник атомної станції детально зупинився на фізичних бар’єрах захисту енергоблоків, розповів про заходи з модернізації та підвищення безпеки на ХАЕС. Зокрема, зазначив, що за весь період експлуатації ХАЕС було виконано 866 відповідних заходів.
Надав детальну інформацію генеральний директор і про додаткові заходи з безпеки здійснені в рамках планово-попереджувального ремонту на ХАЕС, розповів про найближчі плани щодо продовження терміну експлуатації першого енергоблока.
Під час робочої зустрічі фахівці ХАЕС також розповіли представникам Громадської ради про фізичний захист ядерного об’єкта, режим добового регулювання потужності на другому енергоблоці, причини позапланової зупинки другого енергоблока.
Цікавилися відвідувачі і будівництвом комплексу з переробки радіоактивних відходів (КПРВ) для спорудження якого, підготовлені документи для проведення торгів із закупівлі основного обладнання. Після проведення торгів із закупівлі обладнання будуть отримані вихідні дані для виконання робочого проектування КПРВ. Завершити будівництво комплексу планується у 2021 році.
Підсумовуючи результати зустрічі голова Громадської ради при Хмельницькій ОДА Володимир Юр’єв зауважив, що робоча група прозвітує перед населенням області про позитивний результат зустрічі. «Ми отримали вичерпні відповіді на всі наші питання і плануємо продовжувати співпрацю із Хмельницькою АЕС і надалі. Я в свою чергу, впевнився, що на ХАЕС працюють професіонали, які проводять відповідний контроль та дотримуються всіх заходів з безпеки».
Голова комітету з питань екології та природних ресурсів Громадської ради при Хмельницькій ОДА Наталія Міронова, в свою чергу зазначила: «Ми побачили, що колектив ХАЕС має високий рівень готовності до викликів часу та високу міру відповідальності перед суспільством».

Інформаційний центр ВП ХАЕС

Daily Information on Khmelnitsky NPP Operation

2018-03-16

# 90

On March 16, 2018, the 1st unit's power is 1006 MW. Daily generation of electricity is 24,3 million kWh and 364,04 since the beginning of month.
The 2nd unit's power is 1008 MW. Daily generation of electricity is 24,3 million kWh and 364,9 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Daily Information on Khmelnitsky NPP Operation

2018-03-15

# 89

On March 15, 2018, the 1st unit's power is 1007 MW. Daily generation of electricity is 24,3 million kWh and 339,8 since the beginning of month.
The 2nd unit's power is 1008 MW. Daily generation of electricity is 24,3 million kWh and 340,5 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Daily Information on Khmelnitsky NPP Operation

2018-03-14

# 88

On March 14, 2018, the 1st unit's power is 1006 MW. Daily generation of electricity is 24,3 million kWh and 315,5 since the beginning of month.
The 2nd unit's power is 1010 MW. Daily generation of electricity is 24,3 million kWh and 316,2 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Daily Information on Khmelnitsky NPP Operation

2018-03-13

# 87

On March 13, 2018, the 1st unit's power is 1012 MW. Daily generation of electricity is 24,3 million kWh and 291,2 since the beginning of month.
The 2nd unit's power is 1008 MW. Daily generation of electricity is 24,3 million kWh and 291,9 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Results of Emission Monitoring

2018-03-12

# 86

Emission from 05.03.2018 to 12.03.2018

Emission MPE, %
long-lived nuclides 0,0024
Inert gases 0,0619
Iodine 0,0006

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values
Information Centre of SE KhNPP

Daily Information on Khmelnitsky NPP Operation

2018-03-12

# 85

On March 12, 2018, the 1st unit's power is 1009 MW. Daily generation of electricity is 24,3 million kWh and 267 since the beginning of month.
The 2nd unit's power is 1005 MW. Daily generation of electricity is 24,3 million kWh and 267,6 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Daily Information on Khmelnitsky NPP Operation

2018-03-12

# 84

On March 12, 2018, the 1st unit's power is 1009 MW. Daily generation of electricity is 24.27 million kWh and 267 since the beginning of month.
The 2nd unit's power is 1005 MW. Daily generation of electricity is 24.31 million kWh and 267.56 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Photo: Stanislava Ro
Information Centre of SE KhNPP

Вплив Хмельницької АЕС на навколишнє середовище вивчали юні науковці

2018-03-07

# 83

Старшокласники з міста атомників ознайомилися із методами контролю та провели своє дослідження щодо впливу Хмельницької АЕС на навколишнє середовище. Команда учнів ЗОШ №1 відвідала еколого-хімічну та лабораторію зовнішньої дозиметрії ХАЕС.

Юні науковці, за сприяння відділу роботи з громадськістю і засобами масової інформації, беруть участь у Міжнародному учнівському конкурсі, організатор якого Міжнародне агентство з атомної енергії (МАГАТЕ). Мета конкурсу – розповісти про атомну енергетику, її застосування та вплив на населення і навколишнє середовище. За словами керівника юних дослідників Наталії Ярмолюк, пропозиція взяти участь у такому конкурсі зацікавила, і водночас виникло почуття хвилювання та великої відповідальності.

Під час відвідин енергетичного велета, учні мали нагоду поспілкуватися та задати запитання, які їх цікавили, фахівцям відділу охорони навколишнього середовища та цеху радіаційної безпеки, а також були присутні під час відбору проб води на водоймі-охолоджувачі ХАЕС.

По завершенні візиту старшокласники поділились своїми враженнями. Зокрема, Анастасія Кочуренкова зазначила: «Ми вперше на Хмельницькій АЕС, яка вражає своєю масштабністю. Спілкуючись із працівниками, які проводять постійний контроль стану навколишнього середовища, ми пересвідчилися, що атомна станція не приносить шкоди довкіллю, а показники, за якими ведуть спостереження працівники відповідних лабораторій, знаходяться в межах норми».

Інформаційний центр ВП ХАЕС

Зі святом весни!

2018-03-07

# 82

Daily Information on Khmelnitsky NPP Operation

2018-03-07

# 81

On March 7, 2018, the 1st unit's power is 1013 MW. Daily generation of electricity is 24.28 million kWh and 145.66 since the beginning of month.
The 2nd unit's power is 1010 MW. Daily generation of electricity is 24.32 million kWh and 145.94 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Daily Information on Khmelnitsky NPP Operation

2018-03-06

# 80

On March 6, 2018, the 1st unit's power is 1010 MW. Daily generation of electricity is 24,3 million kWh and 121,4 since the beginning of month.
The 2nd unit's power is 1010 MW. Daily generation of electricity is 24,3 million kWh and 121,6 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Results of Emission Monitoring

2018-03-05

# 79

Emission from 26.02.2018 to 05.03.2018

Emission MPE, %
long-lived nuclides 0,0025
Inert gases 0,0641
Iodine 0,0006

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values
Information Centre of SE KhNPP

Daily Information on Khmelnitsky NPP Operation

2018-03-05

# 78

On March 5, 2018, the 1st unit's power is 1010 MW. Daily generation of electricity is 24,3 million kWh and 97,1 since the beginning of month.
The 2nd unit's power is 1008 MW. Daily generation of electricity is 24,3 million kWh and 97,3 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Daily Information on Khmelnitsky NPP Operation

2018-03-03

# 77

On March 3, 2018, the 1st unit's power is 1010 MW. Daily generation of electricity is 24.27 million kWh and 48.54 since the beginning of month.
The 2nd unit's power is 1007 MW. Daily generation of electricity is 24.33 million kWh and 48.65 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Daily Information on Khmelnitsky NPP Operation

2018-03-02

# 76

On March 2, 2018, the 1st unit's power is 1011 MW. Daily generation of electricity is 24,28 million kWh and 24,28 since the beginning of month.
The 2nd unit's power is 1009 MW. Daily generation of electricity is 24,33 million kWh and 24,33 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Спорудження енергоблоків № 3, 4 Хмельницької АЕС: плани та перспективи

2018-03-01

# 75

Спорудження енергоблоків № 3, 4 – один із найважливіших інвестиційних проектів на Хмельницькій АЕС та в енергокомпанії. Серед найближчих планів та перспектив його реалізації отримання схвалення Кабінетом Міністрів України відкоригованого техніко-економічного обґрунтування (ТЕО) будівництва енергоблоків; проведення консультацій з громадськістю в населених пунктах зони спостереження Хмельницької АЕС; актуалізація обстеження і підтвердження довговічності і надійності будівельних конструкцій, будівель і споруд енергоблоків ХАЕС, а також прийняття Закону України «Про розміщення, проектування та будівництво енергоблоків №3, 4 Хмельницької АЕС».
Питання щодо спорудження енергоблоків № 3 та 4 Хмельницької АЕС - актуальне і важливе не лише для регіону, а і для держави в цілому. Журналісти місцевих засобів масової інформації поцікавилися станом справ щодо будівництва Х/3, Х/4 у заступника головного інженера з нових блоків (ЗГІНБ) ВП ХАЕС Геннадія Самосєя.
Розповідаючи про діяльність щодо спорудження енергоблоків ЗГІНБ зазначив, що відкореговане ТЕО з використанням реакторної установки ВВЕР -1000 виробництва фірми «SKODA JS a.s.» пройшло комплексну державну експертизу. Отримано експертний звіт, в якому зазначено, що документація ТЕО будівництва енергоблоків №3, 4 Хмельницької АЕС може бути затверджена в установленому порядку. З матеріалами оновленого техніко-економічного обґрунтування будівництва енергоблоків можна ознайомитися на сайтах Енергоатома та ВП ХАЕС.
«При цьому в проекті РУ ВВЕР-1000 Skoda JS a.s. повинні бути реалізовані всі заходи щодо підвищення безпеки і надійності відповідно до «Комплексної (зведеної) програми підвищення рівня безпеки енергоблоків атомних електростанцій України». Зокрема, планується втілення додаткових систем та заходів з підвищення безпеки: системи видалення водню з гермооболонки (ГО), мобільної установки живлення, систем пасивного відведення тепла та контролюючого скиду тиску з ГО, системи охолодження корпуса реактора, додаткових резервних дизельних електростанцій», - зазначив Г. Самосєй.
На сьогоднішній день в рамках міжнародної Конвенції про оцінку впливу на навколишнє середовище у транскордонному контексті проінформовані, щодо змін в ТЕО сусідні держави зокрема, Білорусь, Польща, Австрія та Словаччина; міністерством екології та природних ресурсів України проводиться екологічна експертиза відкоригованого ТЕО; розроблений проект Розпорядження Кабінету Міністрів України «Про схвалення ТЕО будівництва енергоблоків №3, 4 Хмельницької АЕС»; проводяться консультації з громадськістю, щодо внесених змін в ТЕО будівництва енергоблоків №3, 4 Хмельницької АЕС.
За словами заступника головного інженера з нових блоків, громадські слухання щодо спорудження енергоблоків були проведені в 2011 році, нині, коли відкориговано ТЕО з урахуванням додаткових систем безпеки, проводяться консультації з громадськістю. Провідні фахівці Хмельницької АЕС вже зустрілися з громадськістю міст Славути, Шепетівки, Здолбунова, поінформувавши їх про зміни і переваги відкоригованого ТЕО, про основні преференції для населення території спостереження ХАЕС, пов’язані зі спорудженням нових енергетичних потужностей. «Процес триває, є сподівання, що навесні буде прийнято Закон України «Про розміщення, проектування та будівництво енергоблоків №3, 4 Хмельницької АЕС», який стане поштовхом до подальших дій», - підсумував ЗГІНБ Геннадій Самосєй.

Інформаційний центр ВП ХАЕС

Daily Information on Khmelnitsky NPP Operation

2018-03-01

# 74

On March 1, 2018, the 1st unit's power is 1009 MW. Daily generation of electricity is 24,3 million kWh and 509,91 since the beginning of month.
The 2nd unit's power is 1009 MW. Daily generation of electricity is 24,3 million kWh and 680,46 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Daily Information on Khmelnitsky NPP Operation

2018-03-30

# 106

On March 30, 2018, the 1st unit's power is 1012 MW. Daily generation of electricity is 24,3 million kWh and 702,7 since the beginning of month.
The 2nd unit's power is 1008 MW. Daily generation of electricity is 24,3 million kWh and 704,3 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

На Хмельницькій АЕС вивчали правові аспекти

2018-03-29

# 105

На Хмельницькій АЕС відбулась зустріч трудового колективу з радником Міністра юстиції України, народним депутатом України Ігорем Алексєєвим та начальником Головного управління юстиції у Хмельницькій області Віктором Худняком. На початку заходу було повідомлено, що за ініціативи Міністерства юстиції України відбувся старт всеукраїнського просвітницького проекту «Я маю право!». Крім цього, Указом Президента України 2018 рік оголошено роком початку реалізації цієї ініціативи.
Ігор Алексєєв розповів, що загальнонаціональний просвітницький проект «Я маю право!» створений з метою підвищення правової свідомості українців та інформування громадян щодо механізму захисту їхніх прав у повсякденному житті.

В ході зустрічі йшлося про те, що в Угоді про Асоціацію Європейський Союз і Україна заявили про взаємну повагу до спільних цінностей, верховенства права, основоположних прав і свобод людини. В рамках Діалогу з прав людини налагоджено співпрацю між Україною та ЄС, проводяться щорічні зустрічі з метою дотримання норм міжнародного права у сфері прав людини. Національна стратегія у сфері прав людини та План дій з її реалізації були затверджені ще у 2015 році. План дій розроблявся Мін’юстом спільно із органами державної влади, міжнародними організаціями, представниками громадянського суспільства та містить конкретні заходи, строки виконання, відповідальних виконавців, індикатори виконання тощо. Мін’юст готує звіти по виконанню та проводить громадські обговорення стану виконання Національної стратегії.
Були озвучені питання щодо зменшення ризиків корупції. За словами Ігоря Алексєєва, у цьому напрямку Мін’юст долучився до розробки закону, що захищає бізнес від незаконного захоплення та свавілля силовиків, правоохоронних органів. У народі він відомий як «МаскиШоуСтоп». Для цього було впроваджено такі новації: обов’язкова відео - та аудіофіксація під час обшуків, присутність адвоката при цьому, заборона вилучення оригіналів документів, комп’ютерів та серверів. Крім цього, були створені антирейдерські аграрні штаби по всій Україні.
Користуючись нагодою, з представником Міністерства юстиції України поспілкувались і представники електростанції. Заступник генерального директора з економіки та фінансів Хмельницької АЕС Альвіна Шестак вказала на недосконалість низки законів, зокрема й тих, де йдеться про управління об'єктами державної власності щодо впорядкування процедури відчуження суб'єктами господарювання державного сектору економіки житла своїм працівникам. За її словами, саме це не дає можливості  протягом чотирьох років одержати житло покращеного планування  у 108 квартирах, які передбачені для працівників Хмельницької АЕС.
Більш детально проблему прокоментував голова профкому електростанції Михайло Гук. Він, зокрема, зазначив, що «Державне підприємство «Національна атомна енергогенеруюча компанія «Енергоатом» є одним із підприємств державного сектору економіки України, яке дбає про закріплення на виробництві кваліфікованих кадрів, забезпечення їх високопродуктивної праці та розв’язання соціально-економічних проблем шляхом забезпечення житлом своїх працівників. З цією метою у місті розташування Хмельницької АЕС в 2015 році було введено в експлуатацію другу чергу багатоквартирного будинку на 108 квартир.
Водночас, відповідно до абзацу першого частини дев’ятої статті 11 у редакції Закону України від 13.03.2012 р. №4498-VI "Про управління об’єктами державної власності" (далі - Закон) нерухоме майно об'єктів державної власності, що не підлягають приватизації, не може бути відчужене і щодо такого майна не можуть вчинятися дії, наслідком яких може бути їх відчуження. Отже, внаслідок того, що об’єкт почав будуватися до прийняття змін до Закону, виникла правова колізія щодо неможливості продажу підприємством квартир у новозбудованому будинку для своїх працівників. Ця ситуація призводить до загострення житлової проблеми серед працівників одного із стратегічних енергетичних підприємств України та додаткових витрат коштів державного підприємства на утримання будинка».
Повністю проблема  описана у листі, який було передано народному депутату. Ігор Алексєєв пообіцяв ці питання взяти під особистий контроль.
Далі учасники зустрічі перейшли до ознайомлення із роботою електростанції. Генеральний директор Хмельницької АЕС Микола Панащенко представив детальну презентацію основних напрямків діяльності підприємства, серед яких  підвищення безпеки діючих енергоблоків, мінімізація впливу на довкілля.
Гості проявили інтерес до питань продовження терміну експлуатації першого енергоблока та перспектив завершення будівництва третього та четвертого енергоблоків. Додаткова інформація з уст Миколи Панащенка прозвучала під час оглядової екскурсії машзалу та блочного щита управління першого енергоблока.

Інформаційний центр ВП ХАЕС

Daily Information on Khmelnitsky NPP Operation

2018-03-29

# 104

On March 29, 2018, the 1st unit's power is 1010 MW. Daily generation of electricity is 24,25 million kWh and 678,4 since the beginning of month.
The 2nd unit's power is 1010 MW. Daily generation of electricity is 24,3 million kWh and 679,9 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Daily Information on Khmelnitsky NPP Operation

2018-03-28

# 103

On March 28, 2018, the 1st unit's power is 1010 MW. Daily generation of electricity is 24,3 million kWh and 654,2 since the beginning of month.
The 2nd unit's power is 1013 MW. Daily generation of electricity is 24,3 million kWh and 655,6 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Daily Information on Khmelnitsky NPP Operation

2018-03-27

# 102

On March 27, 2018, the 1st unit's power is 1009 MW. Daily generation of electricity is 24.25 million kWh and 629.91 since the beginning of month.
The 2nd unit's power is 1010 MW. Daily generation of electricity is 24.32 million kWh and 631.32 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP

Results of Emission Monitoring

2018-03-26

# 101

Emission from 19.03.2018 to 26.03.2018

Emission MPE, %
long-lived nuclides 0,0028
Inert gases 0,0688
Iodine 0,0007

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values
Information Centre of SE KhNPP

Daily Information on Khmelnitsky NPP Operation

2018-03-26

# 100

On March 26, 2018, the 1st unit's power is 1010 MW. Daily generation of electricity is 23.24 million kWh and 605.67 since the beginning of month.
The 2nd unit's power is 1011 MW. Daily generation of electricity is 23.3 million kWh and 607 since the beginning of month.
Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.

Information Centre of SE KhNPP