Радіаційний стан навколо Хмельницької АЕС

2020-01-20

# 21

Emission from 08.01.2019 to 13.01.2020

Emission MPE, %
Long-lived nuclides 0.003
Inert gases 0.0674
Iodine 0.0008

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values
Інформаційний центр ВП ХАЕС

Daily Information on Khmelnitsky NPP Operation

2020-01-20

# 20

Today, on January 20, Khmelnitsky 2 is at 1009 MW power.
24.33 million kWh of electricity was generated during the past 24 hours.
462.08 million kWh of electricity has been generated since the beginning of the month.

Khmelnitsky 1 has been in middle overhaul for 421 days.

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values.
Information Centre of Khmelnitsky NPP