Performance Indicators

2018-06-04

# 155

KhNPP 1
Electricity production
 
 per day: 18.54 mln.kW*h 
 
 since the beginning of month: 89.69 mln. kW*h 
 
 since the beginning of quarter: 381.47 mln. kW*h 
 
 since the beginning of year: 1642.58 mln. kW*h 
 
 electricity utilization for auxiliaries: 6.23 % 
 
General characteristics
 
 
 Hours worked: 67.6 ef. days 
 
 Campaign: 301.3 ef. days 
 
 Performance factor (net)of the unit: 29.04 % 
 
 Electrical power (average daily): 772.68 MW 
 
 The temperature of circulating water at the inlet:  14.4  o, C 
 
KhNPP 2
Electricity production
 
 per day: 23.53 mln.kW*h 
 
 since the beginning of month: 94.58 mln. kW*h 
 
 since the beginning of quarter: 1569.08 mln. kW*h 
 
 since the beginning of year: 3615.26 mln. kW*h 
 
 electricity utilization for auxiliaries: 4.67 % 
 
General characteristics
 
 
 Hours worked: 216 ef. days 
 
 Campaign: 323 ef. days 
 
 Performance factor (net)of the unit: 30.99 % 
 
 Electrical power (average daily): 980.58 MW 
 
 The temperature of circulating water at the inlet:  13.9  o, C 
 
Operating mode of heating system
 
  direct  reverse  
 temperature : 7045 o, C 
 
 t of outside air: 22.6 o, C 
 
Emission in ventiduct
 
 long-lived nuclides:  2.71*10+04 Bq /day   MPE*  1,00*10+09  Bq /day 
 
 short-lived nuclides:  . Bq /day   MPE:  not regulated  Bq /day 
 
 Inert gases:  3.09*10+10 Bq /day   MPE:   4,60*10+13  Bq /day 
 
 Iodine:  2.71*10+04 Bq /day   MPE:   4,60*10+09  Bq /day 
 * - maximum permissible emission 
Water utilization
 
 on the town: 7867 m3 
 
 on construction yard: 0 m3 
 
 on industrial site: 279 m3