Production activity of Khmelnitsky NPP in November 2016

Khmelnitsky 1 and Khmelnitsky 2 have been in operation. Khmelnitsky 2 has been connected to the grid after the scheduled middle outage since November 28, 00:53.
Production activity of Khmelnitsky NPP in November, 2016
IndicatorUnitPlan KhNPPFact KhNPPBy units in fact
Kh-1Kh-2
1 Electricity output mln. kWh 710.0 793.8 727.9 65.9
2 Electricity distribution mln. kWh 665.0 747.2 693.9 53.3
3 Electricity utilization for home needs % 6.34 5.87 4.67 19.12
4 Heat energy distribution from headers gigacalories,
thousands
36.1 35.4 35.4 0.0
5 Installed capacity factor % 49.31 55.12 101.09 9.15
Reference:
6 Electricity output of Khmelnitsky NPP
since the beginning of year by 24:00 30.11.2016
mln. kWh 13222.9 13455.9 6865.6 6590.3
7 Electricity output of Khmelnitsky NPP
since the plant commisioning by 24:00 30.11.2016
mln. kWh   266483.7 185688.2 80795.5